Client

Pharma Company

Location

Ankleshwar

600/800Ø Duct fabrication & erection

The scope of this Section comprises supply, erection, testing and commissioning of Self‐contained
Air/Water Cooled Package Units conforming to these Specifications and in accordance with the
requirements of the Schedule of Equipment.

Base panel shall be constructed of fabricated steel structures of adequate size. Casing panels shall be of
heavy gauge GSS welded construction, removable type to provide easy access to equipment and shall be
binderies and painted. Casing shall be complete with plenums, discharge outlets, grilles, space for
refrigeration equipment, fans, cooling coils, etc.